Upper Hill High Rise Construction Projects.

Upper hill
Kings Prism tower

 

 



• Began construction in 2013 and is set to be finished in 2016
• Located in upper hill
• Has five levels of parking
• Has one level of reception recreational(with swimming pool and gym with separate sauna, steam and lockers for men and women ) and restaurant( with indoor and outdoor sitting)
• Available 28 levels of office space which begins from 6th floor upwards for purposes of a stunning view and minimal noise
• Podium level garden with outdoor sitting area
• Available seminar room that can hold around 20 people
• Provision of own toilet(with imported ceramic tiles and water heater ) and pantry inside offices
• Has fire alarm system and emergency lighting system
• There is also a jogging track around the building
• Available floor trucking distribution system and closed circuit tv system
• Has a public address /music system
• Has a diesel generator that acts as the power backup system
• Separate service elevator
• Separate designer bathroom for ladies and gentlemen on each floors
• Security cabin at entry and exit of complex
Britam Towers

 

 

 


• It is a 31 storey building sitting on a 1.5 acre piece of land along hospital hill road
• It is the third tallest building in Africa
• Some parts of the building will have power generated using green features such as wind turbines
• Has retail facilities such as banking halls ,shops and restaurants and mezzanine floors as well as accommodation on the top levels
• It has a twelve storey building silo adjacent to the tower
• Has a 24 hour security surveillance with safe passageways and firefighting systems
UAP Towers

 

• 33 storey building
• Construction began in 2011 and is to end in 2015
• It is 163 meters tall and 5700 meters above sea level
• It is the tallest building yet in Nairobi
• Has a lobby area which is very spacious and is lighted using natural light from an acid etched glass bridge
• It is financed with about 4 billion Kenya shillings
Rahimtulla Towers



• It is the tallest building in upper hill
• The building has 22 storeys
• It is a reinforced concrete structure with blue tinted glass and white louvre tiles
• It also has a double floor height lobby and two basements parking floors
• It was built in 1999
• It has a standby generator
• Installed air conditioning and ample water supply
• Telephone and computer cabling as well as main fibre optic network
• Each floor has a lift and other amenities


Posted

in

by

Tags:

Comments

Leave a Reply

Verified by MonsterInsights